LGfL 2.0 Transition Technical Guide
Please click the image below to view and download initial edition of the LGfL 2.0 Transition Technical Guide.

This will also be sent direct to your school by LGfL, in cohorts, in advance of each school’s planned installation date, as a reminder of the essential actions which must be taken in advance of the first steps in the installation process.
The guide has the following sections:
LGfL strongly recommend that the relevant person(s) in schools read the entire narrative section (p 1 -6) to make themselves familiar with the entire process, well in advance.
The particular attention of schools is drawn to the following points:
-
When a site survey takes place any key staff with concerns about the route cables will take must be present
-
Any requests for a subsequent change of route will incur a charge (min £250)
-
The person carrying out the site survey MUST be accompanied
-
The engineers doing the “civils” (digging etc) are all CRB checked and must be given access to the appropriate areas of the site
-
The engineers doing the cabling are also CRB checked and must be given access to the appropriate areas of the building to complete the installation
-
Before a site survey takes place it is essential that you update the LGfL 2.0 deployment details on the LGfL Support Site
-
When a site survey appointment is arranged please take the earliest possible slot